Hydro Tasmania has utlised the services of RBD Contracting for the past five years for a range of projects at various Hydro Tasmania facilities. Recent installations delivered by RBD Contracting include:
- Installation of equipment to interface with exisiting machine control as part of the BassLink System Protection Scheme.
- The installation of electrical protection as part of the Scada and Synchroniser upgrade projects, and electrical and instrumentation installations as part of the Pulsation Protection project at both John Butters and Tribute Power Stations.
- Electrical installations as part of the Major Protection Upgrade at Lemonthyme Power Station.
- Protection upgrade for the Reece Power Station transmission lines on behalf of Hydro Tasmania and Transend.
- Earthing upgrades at several North–West and West Coast power stations.